EV Articles by Paul Gipe

I’ve pulled together all my articles on EVs and driving electric under one heading–as much for my own benefit as for the benefit of readers.

Laval Road Wheeler Ridge Dcfc Jpg

Two DC Fast Chargers Coming This Summer to I-5 Grapevine Corridor

By

Paul Gipe

EV owners who’ve tackled the Grapevine on I-5 with today’s consumer-oriented EVs know how difficult the route is, necessitating long layovers in Lebec and again in Valencia. That is about to change.

Grover Beach Trip 20150312 0026 02 Jpg

500 Miles in an EV—Some Observations

By

Paul Gipe

We recently completed a 550-mile trip to Grover Beach and San Luis Obispo from Bakersfield in our Nissan Leaf, an electric vehicle (EV). It’s not as far as many have driven, but it’s far more than most owners of EVs. That was one observation we came away with after the excursion.

Grover Beach Trip 20150305 036 Jpg

CEC DCFC Corridor Gaps Southern San Joaquin & Mojave Desert; Grapevine, Valencia, Tehachapi

By

Paul Gipe

There’s an urgent need by owners of consumer-oriented EVs for a DCFC station either at the base of the Grapevine or at Lebec. Similarly, there’s an urgent need for a companion station in Valencia.

Rtemagicc Electric Vehicle Electricity Consumption Early 2015 Jpg Jpg

Our Nissan Leaf’s Electricity Consumption Early 2015

By

Paul Gipe

When we got our recent bill from Pacific Gas & Electric Co., I thought I’d take a look at hour our Electric Vehicle (EV) was affecting our consumption.

Route From Our Home In Bakersfield To The Flying J Truck Stop At Lebec, California Near The Summit Of The Tejon Pass.

EV Trip Report: Bakersfield to Lebec and the Grapevine

By

Paul Gipe

For those of us who live in the San Joaquin Valley, getting to and from Los Angeles in an Electric Vehicle (EV) is a challenge. Southbound, the last charging stations are in Bakersfield. Then it’s a long 30-mile run across the valley floor before Highway 99 and Interstate 5 make a steep climb over the summit of the Tejon pass.

Tehachapi On Plugshare Jpg

Level 2 Charge Station Coming to Tehachapi this Summer

By

Paul Gipe

The City of Tehachapi plans to install a Level 2 commercial charge station near City Hall sometime this summer, says Chris Kirk, assistant city manager. When installed, the station will double the number of charge locations in Tehachapi.