EV Articles by Paul Gipe
I’ve pulled together all my articles on EVs and driving electric under one heading–as much for my own benefit as for the benefit of readers.

Two DC Fast Chargers Coming This Summer to I-5 Grapevine Corridor
By
Paul Gipe
EV owners who’ve tackled the Grapevine on I-5 with today’s consumer-oriented EVs know how difficult the route is, necessitating long layovers in Lebec and again in Valencia. That is about to change.

500 Miles in an EV—Some Observations
By
Paul Gipe
We recently completed a 550-mile trip to Grover Beach and San Luis Obispo from Bakersfield in our Nissan Leaf, an electric vehicle (EV). It’s not as far as many have driven, but it’s far more than most owners of EVs. That was one observation we came away with after the excursion.

CEC DCFC Corridor Gaps Southern San Joaquin & Mojave Desert; Grapevine, Valencia, Tehachapi
By
Paul Gipe
There’s an urgent need by owners of consumer-oriented EVs for a DCFC station either at the base of the Grapevine or at Lebec. Similarly, there’s an urgent need for a companion station in Valencia.

Our Nissan Leaf’s Electricity Consumption Early 2015
By
Paul Gipe
When we got our recent bill from Pacific Gas & Electric Co., I thought I’d take a look at hour our Electric Vehicle (EV) was affecting our consumption.

EV Trip Report: Bakersfield to Lebec and the Grapevine
By
Paul Gipe
For those of us who live in the San Joaquin Valley, getting to and from Los Angeles in an Electric Vehicle (EV) is a challenge. Southbound, the last charging stations are in Bakersfield. Then it’s a long 30-mile run across the valley floor before Highway 99 and Interstate 5 make a steep climb over the summit of the Tejon pass.

Level 2 Charge Station Coming to Tehachapi this Summer
By
Paul Gipe
The City of Tehachapi plans to install a Level 2 commercial charge station near City Hall sometime this summer, says Chris Kirk, assistant city manager. When installed, the station will double the number of charge locations in Tehachapi.