Tests during 2002 at the Wulf Test Field demonstrate that the AirX fails to meet the manufacturer’s power curve by a wide margin.

 

 

Paul Gipe At Wulf Test Field Beginning Installation Of Air Micro Turbine. Bergey 850 In Background.

Since 1997 Paul Gipe and Nancy Nies have used the site to gain experience installing and operating small wind turbines, to measure small turbine performance and noise emissions, and to experiment with various erosion control products and practices.