Articles by
Paul Gipe
PG&E Distributed Wind Energy 07 Conclusion
By
Paul Gipe
Presentation by Paul Gipe for PG&E 21 April 2018 at CalPoly, San Luis Obispo, California. Check against delivery.
PG&E Distributed Wind Energy 01 Introduction
By
Paul Gipe
Presentation by Paul Gipe for PG&E 21 April 2018 at CalPoly, San Luis Obispo, California. Check against delivery.
PG&E Distributed Wind Energy 03 Fundamentals
By
Paul Gipe
Presentation by Paul Gipe for PG&E 21 April 2018 at CalPoly, San Luis Obispo, California. Check against delivery.
PG&E Distributed Wind Energy 05 Hyrbrid and Storage Introduction
By
Paul Gipe
Presentation by Paul Gipe for PG&E 21 April 2018 at CalPoly, San Luis Obispo, California. Check against delivery.
Electricity Rebels and How They’re Changing the Face of Renewable Energy
By
Paul Gipe
Presentation for the CORE Energy Summit in Winnipeg, Manitoba 12 April 2018.
Presentation on Improvements to Small Wind Turbines
By
Paul Gipe
Presentation for CORE Energy Summit in Winnipeg, Manitoba 12 April 2018.
Diesels are Dead: Long Live EVs
By
Paul Gipe
Presentation on Electric Vehicles for the CORE Energy Summit in Winnipeg, Manitoba 12 April 2018.
Bluenergy Giving Me the Blues
By
Paul Gipe
What's up with Canada? I've gotten two enquiries from the Great White North about Bluenergy Solarwind, a US company claiming to have developed another vertical-axis wind turbine (VAWT).

Thule Bike Rack for Chevy Bolt EV
By
Paul Gipe
A few weeks ago I had U-haul install a 1.25-inch hitch receiver on our 2017 Chevy Bolt EV to mount a bike rack.

Transfer of Distribution Rights for Gipe’s Wind Energy for the Rest of Us Completed
By
Paul Gipe
4 April the transfer of remaining copies of Wind Energy for the Rest of Us to a new distributor was completed.

Bakersfield to Springbok Solar Plant Cantil, California in a Chevy Bolt
By
Paul Gipe
17 March a small group caravanned from Bakersfield to the Desert Tortoise Preserve's new parcel adjacent to the Springbok solar power plant near Cantil, California. The plant is located just north of California City and just south of the Honda test track.

Trip Report Bakersfield to Palmdale and Return with Chevy Bolt
By
Paul Gipe
12 March I drove our Chevy Bolt to the ChargePoint station at the Palmdale Water District (PWD). I had an interview with the executives there, and, conveniently for me, they had recently installed a 24 kW DCFC. This is a round trip of about 200 miles. Because of the steep climb from Bakersfield over the Tehachapi Summit, this circuit is near the edge of the Bolt's range. I would charge for a half-hour at the DCFC station and pick up a few kWh as a precaution.
