April 15, 2007
by Paul Gipe and Nancy Nies
The following is a rough translation of the German interconnection procedure for small solar PV systems from a flyer produced by Novotech.
Note that under Germany’s EEG no contract is required.
By Paul Gipe
April 15, 2007
by Paul Gipe and Nancy Nies
The following is a rough translation of the German interconnection procedure for small solar PV systems from a flyer produced by Novotech.
Note that under Germany’s EEG no contract is required.