Electric Auto Association’s Comments on DC Fast Charger Installations for West Coast Electric Highway

By Paul Gipe

The Electric Auto Association (EAA) submitted comments 16 March 2015 to the California Energy Commission on DC Fast Charger installations for the build out of the West Coast Electric Highway. Currently, Oregon and Washington operate a north-south network of DC Fast Chargers along the I-5 corridor–and have done so for several years. California is considerably behind its neighboring states in deploying fast chargers along major intercity corridors. The comments filed by the EAA were written by the Electric Vehicle Corridor Charging Group, a collaborative effort of electric vehicle drivers and advocates spanning the breadth of California.

EAA Comments on DC Fast Charger Installations for West Coast Electric Highway