Articles by
Francois De Beaupuy
World’s Largest Nuclear Power Producer Confronts Serial Glitches
By
Francois De Beaupuy
The Flamanville plant is now slated to be completed in 2022 at a price tag of 12.4 billion euros ($13.8 billion), with the latest glitch costing a whopping 1.5 billion euros. Bemoaning the loss of France’s edge in the sector because of a 15-year gap between the start of construction at the plant and that of the previous reactor, Le Maire has given EDF a month to come up with an action plan to restore the industry’s know-how before the country can determine whether it will build any new atomic plants.
France’s Next President May Face $3 Billion Nuclear Hangover
By
Francois De Beaupuy
Whoever succeeds Francois Hollande as France’s president may find one of their first tasks in office will be selling off some of the nation’s prized assets to prop up the state’s nuclear industry.
